- BNCH HAS COMPLETED NEAR 42,000 METRES TO DATE
- DRILLING AT MARMOT ZONE IS NEAR COMPLETE WITH 5 DRILL HOLES. VISUALLY THE HOLES APPEAR VERY ENCOURAGING BUT THE LAB TELLS THE ECONOMIC STORY (ANTICIPATE GOLD AND SILVER GRADES). AT SILVER POND, DRILL COLLAR LOCATIONS ARE BEING PLANNED NOW AND WE ANTICIPATE DRILLING SILVER POND DURING SEPTEMBER.
- ONLY A SMALL AMOUNT OF DRILLING IS PLANNED AT THE NEW TARGETS. THE MAJORITY OF THE DRILLING IS DEDICATED TO INFILL, DEFINITION AND EXPANSION DRILLING IN THE ‘HEART’ OF THE RESOURCE AREA (CLIFF CREEK ZONE, AGB ZONE, DUKES ZONE)
- BNCH WILL DRILL AS MANY METRES AS POSSIBLE DURING 2020. WE WILL DRILL UP TO 100,000m. BUT 70,000m TOTAL IS A LIKELY NUMBER. THE EXTRA DRILLING METRES WILL PROVIDE TIGHTER SPACING AND DERISK THE RESOURCE ESTIMATE BY MOVING SOME GOLD-SILVER OUNCES INTO THE MEASURED + INDICATED CATEGORY.
- CC-DR CONNECTOR : THIS AREA REMAINS OPEN AND DRILLING TO DATE INDICATES MINERALIZATION EXISTS IN THE CONNECTOR
- AGB REMAINS OPEN TO THE NORTH AND SOUTH BUT THE BEST POTENTIAL APPEARS AT DEPTH. AGB HAS HIGHER GRADE GOLD-SILVER VALUES COMPARED TO CLIFF ZONE AND DUKES ZONE.
- M-Grid : TOO EARLY TO TELL, MORE EXPLORATION DRILLING REQUIRED.
- KODAH WILL BE DRILL TESTED IN 2021.
|