VG Gold Corp Faktenübersicht 12/05/2008

Seite 4 von 6
neuester Beitrag: 06.01.11 11:23
eröffnet am: 12.05.08 15:26 von: harry74nrw Anzahl Beiträge: 134
neuester Beitrag: 06.01.11 11:23 von: louisaner Leser gesamt: 75389
davon Heute: 17
bewertet mit 23 Sternen

Seite: Zurück 1 | 2 | 3 |
| 5 | 6 Weiter  

13.10.09 14:11
1

2565 Postings, 6207 Tage PaiMeiLetter of Intent (LoI) zwischen San Gold und ...

Laurion gezeichnet:

[PDF version attached]

Oct 13, 2009 08:00 ET
VG Gold Welcomes New Davidson-Tisdale Partner San Gold

TORONTO, ONTARIO--(Marketwire - Oct. 13, 2009) - VG Gold Corp., (TSX:VG), (FRANKFURT:VN3), is pleased that San Gold Corporation has signed a Letter of Intent to acquire Laurion Minerals' 31.5% interest in the Davidson-Tisdale project located in Timmins, Ontario, as announced on October 8, 2009. VG Gold owns 68.5% of Davidson-Tisdale, one of four key properties that VG Gold holds in the Timmins Camp.

"VG Gold welcomes the opportunity to have San Gold as a partner. The strategic investment in VG Gold by Rob McEwen's Lexam Explorations and now San Gold's purchase of the Laurion Minerals' Davidson-Tisdale interest are statements of VG's strong asset base and exploration potential in one of the world's premier gold mining camps," stated Tom Meredith, President & CEO of VG Gold.

DAVIDSON-TISDALE PROPERTY

The Davidson-Tisdale property is a high-grade gold deposit located in the heart of the Timmins Gold Camp, where 70 million ounces of gold have been produced to date. The property is on trend between several producing and former producing gold mines. Previous drilling indicates that the Davidson-Tisdale deposit has potential for additional high grade gold mineralization.

The table below presents previously announced VG Gold drill results that intersected high-grade mineralization in the central part of the resource. These results indicate significant resource potential at Davidson-Tisdale, which remains open to depth. Neighbouring Timmins mines have been developed to depths exceeding 6000 feet.


PREVIOUS VG GOLD DRILL RESULTS

--------------------------------------------------
Hole Number  Gold Grade   Interval   Gold Grade   Interval
--------------------------------------------------
                  (gpt)        (m)        (opt)       (ft)
--------------------------------------------------
--------------------------------------------------
03-310            341.1        3.4         9.95       11.2
--------------------------------------------------
04-318            64.18          4         1.87       13.1
--------------------------------------------------
04-326            30.05        8.5         0.88       27.9
--------------------------------------------------





Deeper drilling by VG Gold down to 275 meters (900 ft) successfully encountered encouraging gold mineralization. These holes represent some of the deepest exploration to date at Davidson-Tisdale and they demonstrate that the high-grade could extend further at depth.


PREVIOUS VG GOLD DRILL RESULTS

--------------------------------------------------
Hole Number  Gold Grade   Interval   Gold Grade   Interval
--------------------------------------------------
                  (gpt)        (m)        (opt)       (ft)
--------------------------------------------------
--------------------------------------------------
05-354            17.28        2.5          0.5        8.2
--------------------------------------------------
05-355            12.83        7.5         0.37       24.6
--------------------------------------------------


ABOUT VG GOLD

VG Gold Corp. is a Canadian incorporated gold exploration company, with significant land holdings and gold resources situated in the heart of the world class Timmins Gold Camp. VG Gold's shares trade on the Toronto Stock Exchange under the symbol VG.

VG Gold has four key exploration projects in the heart of the Timmins Gold Camp adjacent to major gold mines owned by Goldcorp. The Fuller, Buffalo Ankerite and Davidson-Tisdale properties have seen successful exploration to date and have significant additional potential. The current exploration focus is on the Paymaster property, recently optioned from Goldcorp and located adjacent to the Goldcorp owned Dome Mine, which has produced 17 million oz of gold to date. VG Gold is well positioned to build shareholder value with ongoing exploration of its Timmins properties.

Details on VG Gold's resources and properties can be accessed at www.vggoldcorp.com.

VG GOLD&WE ARE GOLD

QUALIFIED PERSON

All exploration work was conducted under Kenneth Guy, P. Geo., designated Qualified Person for VG Gold, who has reviewed this press release. Gold analysis of samples collected by VG Gold was assayed by Laboratoire Expert in Rouyn-Noranda, Quebec. Analysis consisted of a fire assay of a 30-gram sample with an atomic absorption finish.
Samples assaying over 1.0 gram per tonne Au are re-assayed with gravimetric finish. Samples noted to contain visible gold are analyzed via total metallic assay method. A rigorous Quality Control and Assurance Program (QA/QC) is in place, using control samples such as Blanks and Rocklabs Standards and duplicate checks. In addition, duplicate analyses of 10% of the samples were corroborated by check assays on sample performed by Bourlamaque Laboratory of Val D'Or, Quebec.

To learn more about VG Gold, (TSX:VG), (FRANKFURT:VN3), visit our
website: www.vggoldcorp.com.

Shares: 140,154,764

The TSX has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

For more information, please contact
VG Gold Corp.
Tom Meredith
President
416 368 0099
www.vggoldcorp.com
-----------
Wir leben alle unter dem gleichen Himmel, aber wir haben nicht alle den gleichen Horizont.

15.10.09 21:07
1

3094 Postings, 6650 Tage PANGÄA$$ VG INSIDER 15 10 2009 latest 10 filings updated

VG Gold Corp. (VG)

As of October 14th, 2009
Filing DateTransaction DateInsider NameOwnership TypeSecuritiesNature of transaction# or value acquired or disposed ofUnit Price
Oct 14/09Dec 19/08Wakeam, NadimDirect OwnershipOptions52 - Expiration of options-150,000 
Oct 14/09Oct 08/08Wakeam, NadimDirect OwnershipOptions52 - Expiration of options-100,000 
Oct 08/09Oct 02/09Wakeam, NadimDirect OwnershipOptions50 - Grant of options50,000 
Oct 08/09Oct 02/09Drake, John C.Direct OwnershipOptions50 - Grant of options400,000$0.400
Oct 08/09Oct 02/09Drake, John C.Direct OwnershipOptions00 - Opening Balance-Initial SEDI Report  
Oct 06/09Oct 02/09Meredith, Thomas W.Direct OwnershipOptions50 - Grant of options150,000 
Sep 10/09Sep 03/09Tait, John GrahamDirect OwnershipCommon Shares10 - Disposition in the public market-12,500$0.470
Sep 10/09Sep 03/09Tait, John GrahamDirect OwnershipCommon Shares10 - Disposition in the public market-35,000$0.460
Sep 02/09Sep 01/09Lexam Explorations Inc.Direct OwnershipWarrants16 - Acquisition under a prospectus exemption24,905,186 
Sep 01/09Sep 01/09Lexam Explorations Inc.Direct OwnershipCommon Shares16 - Acquisition under a prospectus exemption24,905,186$0.080

-----------
Gruss
Euer PANGÄA

19.10.09 14:45
1

2565 Postings, 6207 Tage PaiMeiBohrergebnisse vom 19.10.2009 / Paymaster West

Quelle:

http://www.ariva.de/news/...Paymaster-West-in-Timmins-Ontario-3103015
-----------
Wir leben alle unter dem gleichen Himmel, aber wir haben nicht alle den gleichen Horizont.
Angehängte Grafik:
ganz_ordentlich.jpg
ganz_ordentlich.jpg

19.10.09 15:16
1

3094 Postings, 6650 Tage PANGÄA$ $ VG News DE BEEINDRUCKENDE Goldgehalte Entdeckt

VG Gold Corp.: BEEINDRUCKENDE GOLDGEHALTE ENTDECKT IM PAYMASTER WEST GEBIET IN TIMMINS, ONTARIO, KANADA

14:48 19.10.09

 

Sonstiges

Corporate News übermittelt durch die DGAP - ein Unternehmen der EquityStory AG.
Für den Inhalt der Mitteilung ist der Emittent verantwortlich.

--------------------------------------------------


BEEINDRUCKENDE GOLDGEHALTE ENTDECKT IM PAYMASTER WEST GEBIET IN TIMMINS,
ONTARIO, KANADA

1390,0 g/t Gold auf einer Länge von 0,9 m bzw. 40,54 oz/t Gold auf 3,0 ft

19. Oktober 2009, Toronto, Ontario, Kanada. VG Gold Corp. (TSX:VG, FWB:VN3)
gibt hiermit bekannt, dass eine neue Kernbohrung im Paymaster West Gebiet
in Timmins, Ontario, Kanada erfolgreich eine Goldmineralisierung von hoher
Qualität nahe der Oberfläche durchschnitten hat; so wurden insbesondere
1390,0 Gramm Gold pro Tonne (g/t) auf einer Länge von 0,9 Metern (m), bzw.
40,54 Unzen Gold pro Tonne (oz/t) auf 3,0 Fuß (ft) entdeckt.

VG Gold Corp. hat die Option, 60% der Paymaster West Liegenschaft von
Goldcorp zu erwerben. Das Gebiet befindet sich in unmittelbarer Nähe zu dem
Dome-Bergwerk von Goldcorp, in dem bis heute 17 Mio Unzen Gold abgebaut
wurden.

Bohrergebnisse - Highlights

Bohrloch Nr.     Goldgehalt     Intervall     Goldgehalt     Intervall
                 (g/t)          (m)           (oz/t)         (ft)
VGP-09-20        1390,00        0,9           40,54          3,0
VGP-09-19        11,6           2,0           0,338          6,6


Diese guten Resultate knüpfen an die Bohrergebnisse zu Beginn des
Bohrprogramms von VG Gold in der Paymaster West Liegenschaft an
(Unternehmensveröffentlichung vom 8. September 2009). In der Anfangsphase
wurden in einem Bohrloch 41,67 g/t Gold auf 1,8 m Länge (bzw. 1,22 oz/t
Gold auf 5,9 ft) entdeckt..

Die Bohrungen im Paymaster Gebiet haben die Präsenz einer weit
ausgedehnten, oberflächennahen Goldmineralisierung im Gestein bestätigt.
Die Goldmineralisierung wird von einer sich abwechselnden
Quartz-/Feldspat-/Prophyr-Gesteinsschicht eingeschlossen, welche allgemein
als eine günstige geologische Umgebung für die großen Goldlagerstätten in
Timmins bekannt ist.

Die Ergebnisse der 6 Bohrlöcher finden Sie in einer Tabelle am Ende dieser
Unternehmensmeldung. Die Bohrlöcher haben eine Goldmineralisierung in dem
Bereich zwischen 150 m und 300 m unter der Oberfläche anvisiert.

Die Goldmineralisierung im Paymaster West Gebiet wird von Abschnitten mit
sich stark abwechselnden, gut mineralisierten
Quartz-/Feldspat-/Prophyr-Gesteinsschichten eingeschlossen. Die sich
abwechselnden Gesteinsschichten basieren auf weit verbreitetes Ankerit-
sowie Serizit-Mineral mit lokalem Turmalin; beide Gesteinsschichten
verlaufen verstreut und in Adern. Ferner findet sich durchgehend eine
Pyrit-Mineralisierung im Gestein, mit einer örtlichen Konzentration von bis
zu 20%. Sichtbares Gold wurde in Bohrloch VGP-09-20 entdeckt.

Aufgrund der bislang erfolgreichen Bohrergebnisse plant VG Gold eine
Ausweitung des derzeit 6000 m umfassenden Bohrprogramms. Die Bohrungen
werden fortgesetzt, um die von Prophyr-Gestein eingeschlossene hochgradige
Mineralisierung zwischen 150 m und 300 m unterhalb der Oberfläche
anzuvisieren. Derzeit werden zwei Kern-Bohrtürme im Paymaster Gebiet
eingesetzt.

HISTORISCHE ARBEITEN IM PAYMASTER GEBIET

Die Paymaster-West Liegenschaft befindet sich im Zentrum des Timmins Gold
Camp (hist. Produktion: 70 Millionen Unzen Gold). Das Gebiet liegt in
unmittelbarer Nähe zu dem bekannten Dome-Bergwerk, in dem bisher 17
Millionen Unzen Gold abgebaut wurden. Die Bergwerke im Timmins Gold Camp
wurden bis in eine Tiefe von mehr als 2000 m ausgebaut und betrieben.

Von 1910-1928 wurden Explorations- und Produktionsarbeiten im Paymaster
West Gebiet bis in eine Tiefe von etwa 245 m durchgeführt. In den 1940er
und 1950er Jahren wurde damals bereits anhand einer Serie von
Kernbohrlöchern erfolgreich eine hohe Goldmineralisierung im Gestein über
weite Abschnitte in der Tiefe entdeckt. Diese Bohrungen fanden in einer
Tiefe von 460 m und 760 m unter der Oberfläche statt und konnten das
außergewöhnliche Explorationspotential des Paymaster West Projektes
nachweisen.

Historische Bohrergebnisse vom Paymaster-West-Projekt können auf dieser
Seite eingesehen werden:

http://www.vggoldcorp.com/downloads/Drill_Hole_Table_Paymaster.pdf

VG GOLD..WE ARE GOLD

QUALIFIZIERTE PERSON

Alle Explorationsarbeiten wurden unter der Leitung von Herrn Kenneth Guy,
P. Geo. durchgeführt (dieser ist designierte qualifizierte Person für VG
Gold Corp.), welcher diese Unternehmensveröffentlichung überprüft hat. Die
Goldanalyse der gesammelten Proben von VG Gold wurde von ALS Chemex
durchgeführt. Die Goldbestimmung erfolgte im Rahmen einer
Feuer-Metallanalyse mit einer 30-Gramm Probe und
Atomabsorptionsspektrometrie (AAS). Proben mit mehr als 10,0 g/t Gold
werden erneut überprüft mittels gravimetrischer Analyse. Proben welche
sichtbares Gold aufweisen werden im Rahmen der 'total metallic assay
method' untersucht. Eine strenge Qualitätskontrolle sowie eine
Qualitätssicherung (QA/QC) ist vorhanden, bei der freie und standardisierte
Kontrollproben sowie zweifache Überprüfungen angewendet werden. Ferner
werden zweifache Untersuchungen von 10% der Proben im Rahmen einer
Prüfungsanalyse von einem Drittlabor bestätigt.

Für weitere Informationen können Sie Tom Meredith, President und CEO von VG
Gold Corp. unter der Tel. (+1) 416 368 0099, sowie in Deutschland Maurice
Höwler (Investor Relations Europe) via email unter mhoewler@vggoldcorp.com
erreichen.

Um mehr über VG Gold Corp. zu erfahren, besuchen Sie unsere Homepage:
www.vggoldcorp.com

Die TSX Exchange hat den Inhalt dieser Unternehmensmeldung nicht geprüft
und übernimmt keinerlei Verantwortung für die Angemessenheit oder
Genauigkeit der Angaben. Für die Richtigkeit dieser deutschen Übersetzung
wird keine Haftung übernommen. Bitte beachten Sie die englische
Original-Pressemitteilung.
Bohrloch   Ost  Nord  Länge Länge   dip  az   von   bis  Weite Goldgehalt
  Nr.                  (ft)  (m)              (m)   (m)   (m)    (g/t)
VGP-09-16 6181  9144   1355 413,0   -50 172 176,4 177,4    1,0       6,06
                                            259,9 282,9   23,0       1,40
                                            294,5 296,1    1,6       2,26
              
VGP-09-17 6181  9144 1169,6 356,5   -68 174 107,5 109,3    1,8       2,37
                     
VGP-09-18 5997  9091 1000,7 305,0   -50 180  39,6  41,1    1,5       1,39
                                            186,5 188,1    1,5       1,03
                                            236,1 237,7    1,6       1,19
                                            284,4 285,9    1,5       1,03
                     
VGP-09-19 5997 9091  1335,3 407,0   -69 180 114,6 116,6    2,0      11,60
                                            208,5 210,0    1,5       3,07
                                            383,4 385,4    2,0       3,56
                     
VGP-09-20 5797 8848   675,9 206,0   -50 165  41,5  42,4    0,9    1390,00
                                            155,0 156,5    1,5       1,66
                     
VGP-09-21 5797 8848 764,4   233,0   -70 165 158,5 162,3    3,8       1,20
                                            177,9 181,7    3,9       1,66
                     
6 Bohrlöcher              1.920,5    m  


Anm.:

  - Die angegebenen Längenangaben sind Kern-Durchschnittslängen und stellen
    keine tatsächlichen Weiten dar.

  - Es ist zu erwarten, dass genaue Längenschätzungen durch zusätzliche
    Bohrungen möglich werden.
(c)DGAP 19.10.2009
 

-----------
Gruss
Euer PANGÄA

24.10.09 10:59
2

3094 Postings, 6650 Tage PANGÄA$$ VG INSIDER 23 10 2009 latest 10 filings updated

VG Gold Corp. (VG)

As of October 23rd, 2009
Filing DateTransaction DateInsider NameOwnership TypeSecuritiesNature of transaction# or value acquired or disposed ofUnit Price
Oct 21/09Oct 19/09Lexam Explorations Inc.Direct OwnershipCommon Shares54 - Exercise of warrants37,500,000$0.150
Oct 21/09Oct 19/09Lexam Explorations Inc.Direct OwnershipWarrants54 - Exercise of warrants-37,500,000$0.150
Oct 14/09Dec 19/08Wakeam, NadimDirect OwnershipOptions52 - Expiration of options-150,000 
Oct 14/09Oct 08/08Wakeam, NadimDirect OwnershipOptions52 - Expiration of options-100,000 
Oct 08/09Oct 02/09Wakeam, NadimDirect OwnershipOptions50 - Grant of options50,000 
Oct 08/09Oct 02/09Drake, John C.Direct OwnershipOptions50 - Grant of options400,000$0.400
Oct 08/09Oct 02/09Drake, John C.Direct OwnershipOptions00 - Opening Balance-Initial SEDI Report  
Oct 06/09Oct 02/09Meredith, Thomas W.Direct OwnershipOptions50 - Grant of options150,000 
Sep 10/09Sep 03/09Tait, John GrahamDirect OwnershipCommon Shares10 - Disposition in the public market-12,500$0.470
Sep 10/09Sep 03/09Tait, John GrahamDirect OwnershipCommon Shares10 - Disposition in the public market-35,000$0.460

-----------
Gruss
Euer PANGÄA

29.10.09 08:12
4

24089 Postings, 7553 Tage harry74nrwupdate in deutsch

http://www.vggoldcorp.com/pdfs/...entationGermanOctober2009NEW_MH.pdf

steht u.a. 2010 wird mit partner SAN GOLD verstärkt zusammengearbeitet
-----------
Kurse Daten Fakten

http://harry74nrw.npage.de/gold_66272077.html

Wer Rechtschreibfehler findet, der darf diese gerne behalten

09.11.09 17:37
2

24089 Postings, 7553 Tage harry74nrwresults 09/11

http://www.ariva.de/news/...ERALISIERUNG-IN-DER-TIEFE-deutsch-3124036
-----------
Kurse Daten Fakten

http://harry74nrw.npage.de/gold_66272077.html

Wer Rechtschreibfehler findet, der darf diese gerne behalten

09.11.09 19:06
3

7974 Postings, 6638 Tage louisanerDa geht noch was...

...pari zu den Holzfällern wäre 0,323 und 1 Stunde haben wir noch.

Die Bohrergebnisse sind ja nicht der Knaller, aber die Vererzung setzt sich gemütlich fort.

Diese wenigen Erkundungsbohrungen der letzten Wochen veranlassen mich auf jeden Fall
zum weiteren HALTEN.
Agressiv-Drilling sieht jedoch anders aus.
Wer weiss, die sagen uns doch auch nicht alles!!!

02.12.09 15:09
2

591 Postings, 6306 Tage feliz07Könnte man

auch so sehen das die mit allen Tricks arbeiten. Von der Menge sind 12000 ja gar nix.  

03.12.09 19:31

24089 Postings, 7553 Tage harry74nrwLöschung


Moderation
Zeitpunkt: 03.12.09 22:57
Aktion: Löschung des Beitrages
Kommentar: Löschung auf Wunsch des Verfassers

 

 

03.12.09 21:22

388 Postings, 5932 Tage hecktickShareholdersletter auf der Homepage

08.12.09 14:16
3

2565 Postings, 6207 Tage PaiMeiNeuste BE vom 7. Dezember 2009

VG GOLD EXPANSION DRILLING AT PAYMASTER WEST RETURNS MULTIPLE HOLES WITH HIGH-GRADE GOLD!

32.0 GPT GOLD OVER 1.5 M & 52.8 GPT OVER 0.8 M

December 8, 2009, Toronto, Ontario, Canada VG Gold Corp., (TSX:
VG), (FRANKFURT: VN3) is pleased to announce additional high-grade results from the Paymaster West Project in Timmins, Ontario. The most recently completed 8 drill holes were designed to extend the mineralization at depth and along strike. Highlights from the most recent drill holes are listed below:


| Hole #       | Au       | Width | Au     | Width |
|              | (gpt)    | (m)   | (opt)  | (ft)  |
|              |          |       |        |       |
| VGP-09-27    | 9.66     | 1.2   | 0.282  | 3.9   |
|              |          |       |        |       |
| VGP-09-34    | 16.85    | 1.5   | 0.492  | 5.0   |
|              |          |       |        |       |
| VGP-09-34    | 1.61     | 31    | 0.047  | 101.7 |
|              |          |       |        |       |
| VGP-09-36    | 32.0     | 1.5   | 0.933  | 5.0   |
|              |          |       |        |       |
| VGP-09-37    | 52.8     | 0.8   | 1.54   | 2.7   |
|              |          |       |        |       |
| VGP-09-37    | 15.0     | 1.4   | 0.438  | 4.5   |


The Paymaster West Project is situated immediately west of Goldcorp's Dome Mine that has produced over 17 million ounces of gold from both underground and open pit mining.

This news release includes drilling conducted at the east (section
6600E) and west (section 4900E) ends of the mineralized porphyry, covering a strike length of 518 m (1,700 ft). These holes represent the furthest VG Gold has drilled to the east and west.

EXPANDING THE MINERALIZATION
Along Strike and at Depth

Hole VGP-09-37 (section 6600E): This hole, which is the furthest VG Gold has drilled to the east, returned two intervals of high-grade,
52.8 gpt (1.54 opt) over 0.8 m (2.7 ft) and 15.0 gpt Au (0.438 opt) over 1.4 m (4.5 ft). This zone of altered and well mineralized porphyry extends the known mineralization along strike by 61 m (200 ft).

Drill Hole VGP-09-36 (section 6400E): This hole was drilled at the east end of the known mineralization and intersected: 4.98 gpt
(0.145 opt) over 11.9 metres (39.0 ft) including 32.0 gpt (0.933
opt) over 1.5 metres (5.0 ft), adding continuity between sections.

Hole VGP-09-34 (section 6500E): This hole intersected 16.85 gpt
(0.492 opt) over 1.5 m (5.0 ft) and a wider interval of mineralized porphyry assaying 1.61 gpt (0.047 opt) over 31 m (101.7 ft), at a depth of approximately 370 m (1,215 ft) below surface. This extensive zone of altered and well mineralized porphyry extends the mineralization at depth beyond  the previously released holes.

Gold mineralization at the Paymaster West Project is hosted within and peripheral to strongly altered and mineralized quartz feldspar porphyry.  Alteration consists of pervasive ankerite and sericite alteration with local tourmaline, both disseminated and in veins.
Pyrite mineralization is disseminated throughout, with local concentrations up to 20%.

VG Gold has the option to earn a 60% interest in the Paymaster West Property from Goldcorp by making $6.0 million in expenditures by June 2012. Once VG Gold has given notice that it has earned its 60%, Goldcorp has six months to decide if it wishes to increase its ownership from 40% to 70% by paying VG Gold $710,000 and spending
$8.25 million on the property within two years and also completing a feasibility study by the end of year three.


VG Gold....WE ARE GOLD!
-----------
Wir leben alle unter dem gleichen Himmel, aber wir haben nicht alle den gleichen Horizont.

08.01.10 10:01
2

24089 Postings, 7553 Tage harry74nrwBeitrag VG mit KZ 0,90

http://www.irw-press.com/dokumente/SDR_Dez09_Gold_Spezial.pdf
-----------
Kurse Daten Fakten

http://harry74nrw.npage.de/gold_66272077.html

Wer Rechtschreibfehler findet, der darf diese gerne behalten

25.01.10 14:14

556 Postings, 5985 Tage HectorPascalBohrergebnisse Paymaster

VG Gold Corp.: Bohrergebnisse aus dem Paymaster West Projekt in Timmins, Ontario, Kanada.

14:04 25.01.10

Sonstiges

Corporate News übermittelt durch die DGAP - ein Unternehmen der EquityStory AG.
Für den Inhalt der Mitteilung ist der Emittent verantwortlich.

--------------------------------------------------


Bohrergebnisse aus dem Paymaster West Projekt in Timmins, Ontario, Kanada.

129,50 g/t (3,78 oz/t) Gold auf einer Länge von 0,9 m

25. Januar 2010, Toronto, Ontario, Kanada. VG Gold Corp., (TSX: VG; FWB:
VN3; OTC: VGGCF) gibt hiermit erfreuliche Bohrergebnisse aus dem Paymaster
West Projekt in Timmins, Ontario, Kanada bekannt. Das beste Resultat
erzielte das Diamant-Kernbohrloch VGP-09-58 durch einen Abschnitt mit einer
hochgradigen Goldmineralisierung von 129,50 g/t (3,78 oz/t) Gold auf 0,9m
(3,0 ft). Zudem zeigte das Bohrloch VGP-09-53 einen längeren
Gesteinsabschnitt mit einem niedrigeren Goldgehalt von 1,28 g/t (0,04 oz/t)
Gold auf 30,2 m (99,1 ft). Beide Bohrergebnisse zeigten sich in einem
Bereich nahe der Oberfläche.

Die beiden oberflächennahen Kernbohrungen wurden in der sogn. Paymaster
West Prophyr-Gesteinszone durchgeführt und dem auf tiefer liegende
Gesteinsabschnitte fokussierten Bohrprogramm 'Phase 2' hinzugefügt. Die
beiden Kernbohrlöcher dienten dazu, bereits früher veröffentlichte
Ergebnisse von Bohrungen nahe der Oberfläche, einschließlich 1,0 g/t (0,029
oz/t) auf einer Weite von 44,2 m (144,9 ft) sowie 1,40 g/t (0,041 oz/t) auf
einer Weite von 23,0 m (75,5 ft), weiter zu verfolgen. Tiefere
Kernbohrungen werden in der Paymaster West Porphyry Gesteinszone
fortgesetzt.

Bohrergebnisse - Highlights
(alle Ergebnisse finden Sie in der Tabelle 1)

Bohrloch-Nr.          von         bis         Weite       Goldgehalt
                     (m)         (m)         (m)         (g/t)
VGP-09-51             89,3        106,3       17,0        1,36
VGP-09-53             70,3        100,5       30,2        1,28
VGP-09-57             160,7       168,3       7,6         2,55
VGP-09-58             58,5        59,4        0,9         129,50


'Es ist wirklich sehr erfreulich, eine solche Goldmineralisierung in einer
der wichtigsten Goldbergbauregionen der Welt feststellen zu können. Das
Timmins Gold Camp ist bekannt für seine Bergwerke mit Untertage- und
Tagebergbau und wir sehen für das Paymaster West Gebiet Potential für beide
Szenarios. Im Laufe des Jahres 2010 werden wir die Geschwindigkeit unserer
Bohrprogramme erhöhen, um das Paymaster West Projekt sowie unsere anderen
hervorragenden Projekte im Timmins Gold Camp deutlich weiter zu
entwickeln', sagte Tom Meredith, Präsident and CEO von VG Gold Corp.

Die Goldmineralisierung im Paymaster West Gebiet wird an der Außenfläche
und im Innern von Abschnitten mit stark modifizierten, gut mineralisierten
Gesteinsschichten aus Quartz-/Feldspat-/Prophyrgestein eingeschlossen. Der
Wechsel der Gesteinsschichten basiert auf weit verbreitetes Ankerit- sowie
Serizit-Mineral mit lokalem Turmalin; beide Gesteinsschichten verlaufen
verstreut und in Adern. Ferner findet sich durchgehend eine
Pyrit-Mineralisierung im Gestein, mit einer örtlichen Konzentration von bis
zu 20%. Die Bohrungen bis zum heutigen Tag haben mehrere Intervalle aus
verändertem mineralisierten Quartz/Feldspat-Prophyrgestein durchschnitten.

VG Gold Corp. hat die Option 60% der Paymaster West Liegenschaft im Rahmen
eines Joint Ventures mit Goldcorp zu erwerben, falls VG Gold 6 Mio. CAD an
Explorationsausgaben bis Juni 2012 in die Liegenschaft investiert. Sobald
VG Gold den Erwerb von 60% des Gebietes bekannt gibt, hat Goldcorp 6 Monate
Zeit, um zu entscheiden, ob das Unternehmen seinen Besitz von 40% auf 70%
erhöhen möchte, durch Zahlung von 710.000 CAD an VG Gold sowie die
Übernahme von Explorationskosten für das Gebiet im Umfang von 8,25 Mio. CAD
innerhalb von zwei Jahren und die Durchführung einer
Projekt-Realisierbarkeitsstudie bis zum Ende des 3. Jahres.

VG GOLD....WIR SIND GOLD!
QUALIFIZIERTE PERSON

Alle Explorationsarbeiten wurden unter der Leitung von Herrn Kenneth Guy,
P. Geo. durchgeführt (dieser ist designierte qualifizierte Person für VG
Gold Corp.), welcher diese Unternehmensveröffentlichung überprüft hat. Alle
Bohrungen wurden mit der Nutzung von sogn. NQ-Kerngrößen abgeschlossen. Die
Goldanalyse der gesammelten Proben von VG Gold wurde von ALS Chemex
durchgeführt. Die Goldbestimmung erfolgte im Rahmen einer
Feuer-Metallanalyse mit einer 30-Gramm Probe und
Atomabsorptionsspektrometrie (AAS). Proben mit mehr als 10,0 g/t Gold
werden erneut überprüft mittels gravimetrischer Analyse. Proben welche
sichtbares Gold aufweisen werden im Rahmen der 'total metallic assay
method' untersucht. Eine strenge Qualitätskontrolle sowie eine
Qualitätssicherung (QA/QC) ist vorhanden, bei der freie und standardisierte
Kontrollproben sowie zweifache Überprüfungen angewendet werden. Ferner
werden zweifache Untersuchungen von 10% der Proben im Rahmen einer
Prüfungsanalyse von einem Drittlabor bestätigt.

Für weitere Informationen und bei Fragen von Aktionären, Investoren und
Medien steht Ihnen Herr Maurice Höwler (Investor Relations Europe) als
Ansprechpartner in Deutschland unter der Email-Adresse
mhoewler@vggoldcorp.com zur Verfügung.

Um mehr über VG Gold Corp. zu erfahren, besuchen Sie auch unsere neue,
deutsche Homepage: http://german.vggoldcorp.com

Tabelle 1: Kernbohrlöcher nahe der Oberfläche - Paymaster West Projekt
(Phase 2)

Bohrloch-Nr. Ost Nord  ele  Länge  dip az   von  bis    Weite  Goldgehalt
                            (m)            (m)  (m)     (m)    (g/t)

VGP-09-51   5900 8120 11020 137,0 -45 360   89,3 106,3   17,0   1,36
VGP-09-53   5900 8120 11020 140,0 -75 360   70,3 100,5   30,2   1,28

VGP-09-55   5800 8150 11020 156,0 -75 360   42,0  43,5    1,4   2,85

VGP-09-56   5800 7950 11020 125,0 -60 360   71,9  73,5    1,5   2,15
                                           78,0  79,6    1,5   2,21
                                           93,3  96,3    3,0   1,56
                                           99,4 103,0    3,5   2,78
                                          119,1 120,0    0,9   4,37
                                          123,0 124,0    1,0   3,67
     
VGP-09-57   5800 7950 11020 194,0 -45 360  160,7 168,3    7,6   2,55
                                          183,6 184,7    1,2   3,83
     
VGP-09-58   6145 8051 11025 146,0 -45  35   58,5  59,4    0,9 129,50
                                           71,0  72,2    1,2   2,22

VGP-09-59   6145 8051 11025       -60  35  113,3 115,1    1,8   1,01

*Die Kernbohrlöcher VGP-09-52 und 54 haben keine signifikanten Werte
ermittelt.
Die TSX Exchange hat den Inhalt dieser Unternehmensmeldung nicht geprüft
und übernimmt keinerlei Verantwortung für die Angemessenheit oder
Genauigkeit der Angaben. Für die Richtigkeit dieser deutschen Übersetzung
wird keine Haftung übernommen. Bitte beachten Sie die englische
Original-Pressemitteilung.

(c)DGAP 25.01.2010  

25.01.10 15:34

7974 Postings, 6638 Tage louisanerJa - Wahnsinn - 129,5g/t

...auf Dreikäsehoch und 6 oberflächennahe Bohrlöcher a (sagen wir mal 65 Meter).
Da haben die sich ja richtig ins Zeug gelegt mit Ihrem agressivem Drilling!

Bin ich eigentlich zu verwöhnt, oder warum finde ich diese News Sche...e?

25.01.10 15:40

1095 Postings, 6303 Tage StockaddictedNa ja,

einen Krieg kann man damit nicht gewinnen und ein Hype wird damit auch nicht ausgelöst.
Wenigstens hält sich das Management an seine Versprechungen. Immerhin!
Das rechte Timing für News hat VG auch nicht gerade drauf.
Trotzdem wünsche ich allen viel Glück mit VG.
 
-----------
Gruß S.

31.01.10 21:07
2

2565 Postings, 6207 Tage PaiMeiPaymaster West Phase II Bohrungen (1)

Geplantes Phase II Bohrprogramm
-----------
Wir leben alle unter dem gleichen Himmel, aber wir haben nicht alle den gleichen Horizont.
Angehängte Grafik:
6000m_phase_ii_1.png (verkleinert auf 45%) vergrößern
6000m_phase_ii_1.png

31.01.10 21:12
2

2565 Postings, 6207 Tage PaiMeiPaymaster West Phase II Bohrungen (2)

Erste Ergebnisse: Loch 16-21 (von insgesamt 20 Löchern)
Auf dieser Darstellung fehlen 2 geplante Löcher!
-----------
Wir leben alle unter dem gleichen Himmel, aber wir haben nicht alle den gleichen Horizont.
Angehängte Grafik:
6000m_phase_ii_2.png (verkleinert auf 49%) vergrößern
6000m_phase_ii_2.png

31.01.10 21:17
2

2565 Postings, 6207 Tage PaiMeiPaymaster West Phase II Bohrungen (3)

Die nächsten Ergebnisse: Löcher 22,23,24 und 31,32 (bis hier 11von insgesamt 20 Löchern)
Auf dieser Darstellung fehlen immer noch 2 geplante Löcher (Vgl. dazu Paymaster West Phase II Bohrungen (1)
-----------
Wir leben alle unter dem gleichen Himmel, aber wir haben nicht alle den gleichen Horizont.
Angehängte Grafik:
6000m_phase_ii_3.png (verkleinert auf 55%) vergrößern
6000m_phase_ii_3.png

31.01.10 21:28
1

2565 Postings, 6207 Tage PaiMeiPaymaster West Phase II Bohrungen (4)

Ergebnisse der Löcher 25-27 und 33-37 (bisher 19 von insgesamt jetzt 23)
-----------
Wir leben alle unter dem gleichen Himmel, aber wir haben nicht alle den gleichen Horizont.
Angehängte Grafik:
6000m_phase_ii_4.png (verkleinert auf 56%) vergrößern
6000m_phase_ii_4.png

31.01.10 21:37
1

2565 Postings, 6207 Tage PaiMeiPaymaster West Phase II Bohrungen (5)

ab hier wird's dann etwas unübersichtlich, da diese "berichteten" Löcher vorher nirgends erwähnt wurden. Es ist auch nicht klar, was mit den vier ausstehenden "tieferen" Löchern passiert ist, die im vorherigen Posting noch als unausgefüllte Kreise dargestellt sind. Müßte man nochmals in den entsprechenden "news" nachlesen. Es waren ja auch Löcher dabei, die keine erwähnenswerten Gehalte aufgewiesen hatten (weisse Löcher, eben).
-----------
Wir leben alle unter dem gleichen Himmel, aber wir haben nicht alle den gleichen Horizont.
Angehängte Grafik:
6000m_phase_ii_5.png (verkleinert auf 51%) vergrößern
6000m_phase_ii_5.png

03.02.10 14:31
1

2565 Postings, 6207 Tage PaiMeiPaymaster West Phase II (Bohrungen) (6)

So, mit den heutigen (03.02.2010) News sind die Phase II Bohrungen abgeschlossen und berichtet. Wie man sieht, gibt es auf der Darstellung keine "weiß0en Löcher" mehr.
-----------
Wir leben alle unter dem gleichen Himmel, aber wir haben nicht alle den gleichen Horizont.
Angehängte Grafik:
6000m_phase_ii_6.png (verkleinert auf 58%) vergrößern
6000m_phase_ii_6.png

17.02.10 17:35

24089 Postings, 7553 Tage harry74nrwBeginn JV mit San Gold

VG Gold Corp.: VG Gold beginnt mit Bohrprogramm in dem Joint Venture Projekt Davidson Tisdale mit San Gold in Timmins, Ontario, Kanada
14:08 17.02.10

Sonstiges

Corporate News übermittelt durch die DGAP - ein Unternehmen der EquityStory AG.
Für den Inhalt der Mitteilung ist der Emittent verantwortlich.
--------------------------------------------------

VG Gold beginnt mit Bohrprogramm in dem Joint Venture Projekt Davidson
Tisdale mit San Gold in Timmins, Ontario, Kanada

17. Februar 2010, Toronto, Ontario, Kanada. VG Gold Corp. (TSX: VG; FWB:
VN3; OTC: VGGCF) gibt hiermit bekannt, dass die Bohrungen in der Davidson
Tisdale Liegenschaft begonnen haben. Für das Projekt besteht ein Joint
Venture von VG Gold und San Gold Corporation. VG Gold ist der Operator des
Joint Ventures mit einem 68,5% Anteil, während San Gold Corp. 31,5% an dem
aussichtsreichen Gebiet besitzt, welches sich etwa 4,8 km in östlicher
Richtung von den Bergwerken Hollinger und McIntyre (hist. Produktion: 30
Mio. Unzen Gold) entfernt befindet.

Frühere Explorationsbohrungen in der Liegenschaft konzentrierten sich auf
Abschnitte bis in eine Tiefe von lediglich 250m unterhalb der Oberfläche.
Die Wahrscheinlichkeit für die Entdeckung von hochwertigen Goldvorkommen in
der Tiefe wird als außerordentlich hoch eingestuft, da andere Bergwerke in
der Nachbarschaft in Timmins bis in eine Tiefe von 2000m ausgebaut und
betrieben wurden. Für das Davidson Tisdale Gebiet konnte VG Gold bereits in
der Vergangenheit die Präsenz von hochwertigen Goldzonen nachweisen. Durch
Bohrungen im Jahre 2004 wurde damals eine beträchtliche Goldmineralisierung
im Gestein unterhalb der früher bekannten Abschnitte festgestellt. Um
historische Bohrergebnisse aus dem Davidson Tisdale Gebiet, insbesondere
aus dem Bohrprogramm von 2003-2004 einzusehen, besuchen Sie die folgende
Seite: www.vggoldcorp.com/pdfs/Drill_Hole_Table_Tisdale.pdf

Die neuen Bohrungen ab 250m Tiefe haben nun die weitere Ausdehnung der
bekannten Abschnitte mit hochwertiger Mineralisierung zum Ziel. Mit San
Gold, einem der führenden Explorationsunternehmen in Kanada an der Seite
von VG Gold, plant das Management die Weiterentwicklung des Projektes.
'Diese Chance eine derartige Goldlagerstätte explorieren zu können in einer
der bekanntesten Bergbauregionen der Welt ist wirklich hervorragend. Das
Timmins Gold Camp ist bekannt für dessen Goldbergwerke mit einer hohen
Wirtschaftlichkeit bei der Goldförderung und wir sehen sehr gutes Potential
für das Davidson Tisdale Joint Venture. Wir werden im Laufe des Jahres 2010
die Explorationsarbeiten sehr offensiv durchführen, um dieses Projekt und
zudem auch unsere anderen Projekte in Timmins weiterzuentwickeln' sagte
Tom Meredith, Präsident und CEO.

Dale Ginn, CEO von San Gold stimmte ebenfalls zu mit den Worten: 'Wir
freuen uns über den Beginn eines offensiven Explorationsprogramms in einem
der weit entwickelten und qualitativ hochwertigsten Goldprojekte im Timmins
Gold Camp und wir planen eine enge Zusammenarbeit mit unserem
Partnerunternehmen VG Gold in dem Davidson Tisdale Projekt.'

VG Gold....WIR SIND GOLD!

QUALIFIZIERTE PERSON

Alle Explorationsarbeiten wurden unter der Leitung von Herrn Kenneth Guy,
P. Geo. durchgeführt (dieser ist designierte qualifizierte Person für VG
Gold Corp.), welcher diese Unternehmensveröffentlichung überprüft hat. Alle
Bohrungen wurden mit der Nutzung von sogn. NQ-Kerngrößen abgeschlossen. Die
Goldanalyse der gesammelten Proben von VG Gold wurde von ALS Chemex
durchgeführt. Die Goldbestimmung erfolgte im Rahmen einer
Feuer-Metallanalyse mit einer 30-Gramm Probe und
Atomabsorptionsspektrometrie (AAS). Proben mit mehr als 10,0 g/t Gold
werden erneut überprüft mittels gravimetrischer Analyse. Proben welche
sichtbares Gold aufweisen werden im Rahmen der 'total metallic assay
method' untersucht. Eine strenge Qualitätskontrolle sowie eine
Qualitätssicherung (QA/QC) ist vorhanden, bei der freie und standardisierte
Kontrollproben sowie zweifache Überprüfungen angewendet werden. Ferner
werden zweifache Untersuchungen von 10% der Proben im Rahmen einer
Prüfungsanalyse von einem Drittlabor bestätigt.

Für weitere Informationen und bei Fragen von Aktionären, Investoren und
Medien steht Ihnen Herr Maurice Höwler (Investor Relations Europe) als
Ansprechpartner in Deutschland unter der Email-Adresse
mhoewler@vggoldcorp.com zur Verfügung.

Um mehr über VG Gold Corp. zu erfahren, besuchen Sie auch unsere neue,
deutsche Homepage: http://german.vggoldcorp.com

Die TSX Exchange hat den Inhalt dieser Unternehmensmeldung nicht geprüft
und übernimmt keinerlei Verantwortung für die Angemessenheit oder
Genauigkeit der Angaben. Für die Richtigkeit dieser deutschen Übersetzung
wird keine Haftung übernommen. Bitte beachten Sie die englische
Original-Pressemitteilung.
-----------
Wer Rechtschreibfehler findet, der darf diese gerne behalten

Seite: Zurück 1 | 2 | 3 |
| 5 | 6 Weiter  
   Antwort einfügen - nach oben