noch jemand mitliest. Sind die Kosten nicht zu hoch ( 1263 $)? Sonst klingt das ja sehr interessant.
Vancouver, British Columbia, September 8, 2016 International Tower Hill Mines Ltd. (ITH or the Company) (TSX: ITH; NYSE-MKT: THM) today announced the results of a Pre-Feasibility Study (the PFS) on an optimized configuration for its Livengood Gold Project (the Project) located near Fairbanks, Alaska. The engineering optimization studies incorporated in the PFS evaluated several scenarios, ultimately selecting a project that will process 52,600 tons per day and produce 6.8 million ounces of gold over 23 years. This improved configuration has reduced the capital costs (CAPEX) by 34% or $950 million to $1.84 billion, the process operating cost (process OPEX) by 28% or $2.97 per ton to $7.48 per ton, and the all-in sustaining costs by 16% or $242 to $1,263 per ounce, all as compared to the 100,000 tons per day project evaluated in the September 2013 Feasibility Study (the FS). All dollar figures in this news release are stated in US Dollars.
|