EUROPEAN LITHIUM UPDATE ON THE PFS FOR THE WOLFSBERG LITHIUM PROJECT European Lithium Limited (ASX:EUR, FRA:PF8, VSE:ELI) (the Company) is pleased to announce that all consultants contributing to the pre-feasibility study (PFS) for its Wolfsberg lithium project have been appointed. As reported to the ASX on the 18th October 2017 DRA Global (“DRA”) has been appointed to lead the PFS and integrate the work of all consultants and undertake the engineering and capital and operating cost estimates for the processing and infrastructure. The engineering will largely be carried out in the Johannesburg, South Africa office of DRA with input from their Montreal office which has extensive experience with the Nemaska Lithium project. SRK (United Kingdom) has been appointed as the mine design consultant and will develop their preliminary mine design to PFS level. They will also recommend the drilling programme to bring the Inferred resource into the Indicated category so that it can be included in the mine design for a future definitive feasibility study. Dorfner Anzaplan, Germany, who undertook the metallurgical test work for the project have been retained to conduct further test work to support the DRA engineering design. Benchmark Minerals Intelligence, United Kingdom, will undertake the marketing study for lithium carbonate and lithium hydroxide particularly focusing on the requirements for the lithium battery plants being developed in Europe. Orykton Consulting, Greece, will undertake an evaluation of the market for chemical grade spodumene concentrate with particular reference to China. They will also evaluate the markets for the by-products of feldspar and quartz from the physical processing plant and the by-products of sodium sulphate and aluminium silicate from the conversion of spodumene concentrate to battery grade lithium carbonate and lithium hydroxide. A marketing and sales plan for the by-products will be developed. The DRA project team has been established and a kick off meeting was held in Wolfsberg, Austria from 31 October 2017 to 2 November 2017 with the Company to clarify responsibilities for inputs to the PFS and battery limits. A work schedule was developed for completion of the PFS in Q1 2018
...das ATH lag an der ASX im Jahre 2011 bei 0,25 AUD. Da haben wir noch etwas vor uns! Aber unsere gestrige Performance kann sich echt sehen lassen. Bin gespannt, wie wir uns heute machen... ;-)
Senseo2016
: Bei den News von gestern legen wir heute
vor. Davon gehe ich stark aus.
Hinweis nach §34b WpHG zur Begründung möglicher Interessenskonfl.: Der Verfasser von o.g. Beitrag kann Short- und/oder Long-Positionen in der/den behandelte(n) Aktie(n) halten.
Senseo2016
: Australien unter fetten Volumen ( 18 Mio )
Close auf Tageshoch.
Hinweis nach §34b WpHG zur Begründung möglicher Interessenskonfl.: Der Verfasser von o.g. Beitrag kann Short- und/oder Long-Positionen in der/den behandelte(n) Aktie(n) halten.
Hinweis nach §34b WpHG zur Begründung möglicher Interessenskonfl.: Der Verfasser von o.g. Beitrag kann Short- und/oder Long-Positionen in der/den behandelte(n) Aktie(n) halten.
Hinweis nach §34b WpHG zur Begründung möglicher Interessenskonfl.: Der Verfasser von o.g. Beitrag kann Short- und/oder Long-Positionen in der/den behandelte(n) Aktie(n) halten.
Hinweis nach §34b WpHG zur Begründung möglicher Interessenskonfl.: Der Verfasser von o.g. Beitrag kann Short- und/oder Long-Positionen in der/den behandelte(n) Aktie(n) halten.